which of the following is the correct way to calculate total cost?
-
A.
Addition of fixed cost to variable cost -
B.
Division of total cost by total output -
C.
Multiplication of fixed cost by the variable cost -
D.
Subtraction of fixed cost from total cost -
E.
Addition of marginal cost to average cost