THE EFFECTS OF CONSTRUCTION DELAYS ON PROJECTS DELIVERY IN NIGERIA

Abstract


Construction delay has become endemic in Nigeria. It is imperative to create awareness of the extent to which delays can adversely affect project delivery. This paper identifies, by questionnaire evaluates and through empirical method assesses the effects of construction delays. The findings showed that time and cost overruns were frequent effects of delay. Delay had significant effect on completion cost and time of 61 building projects studied. Client-related delay is significant in Nigeria. Acceleration of site activities coupled with improved clients’ project management procedure and inclusion of appropriate contingency allowance in precontract estimate should assuage the adverse effect of construction delays.        

TABLE OF CONTENTS

Abstract

CHAPTER ONE

1.0    Introduction

1.1   Background of Study

1.2   Statement of Problems

1.3   Research Objectives

1.4   Research Question

1.5   Research Hypothesis  

1.6   Scope of Study

1.7   Significance of study

1.8   Limitation of study

1.9   Definition of terms

CHAPTER TWO

2.0   Literature Review

CHAPTER THREE

3.0   Research methodology

3.1   Research Design

3.2   Population of study

3.3   Sampling Design and Procedure

3.4   Data Collection Instrument

3.5   Administration of Data Collection Instrument

3.6   Methods of data analysis

CHAPTER FOUR

4.0   Data Presentation and Analysis

4.1   Data Presentation 

4.2   Test of Hypothesis 

CHAPTER FIVE

5.0   Summary, Conclusion and Recommendation

5.1   Summary

5.2   Conclusion

5.3    Recommendation

References

Questionnaire

You May Also Like