Answers The cost that raises from failure to load or unload a ship at the port… The cost that raises from failure to load or unload a ship at the port within a stipulated period is known as A. excess charges B. demurrage charges C. permium charges D. trade charges Correct Answer: Option B Explanation
Answers Evaluate (frac{(05652 – 04375)^2}{0.04}) correct to three significant figures Evaluate (frac{(05652 – 04375)^2}{0.04}) correct to three significant figures A. 3.11 B. 3.13 C. 0.313 D. 3.12 Correct… Read More
Answers Which of the following materials is not allowed in the harvesting of fish? Which of the following materials is not allowed in the harvesting of fish? A. nets B. baskets C.… Read More
Answers The highest lands in Nigeria are found on the The highest lands in Nigeria are found on the A. Mambilla Plateau B. Western Highland C. Oban Hills… Read More
Answers In the question below choose the word(s) or phrase(s) which best fills(s) the gap(s): Only… In the question below choose the word(s) or phrase(s) which best fills(s) the gap(s): Only observers from the… Read More
Answers Given: Opening capital – #50,000 Closing capital – #64,000 Drawings – #16,000 Determine the net… Given: Opening capital – #50,000 Closing capital – #64,000 Drawings – #16,000 Determine the net profit A. #2,000… Read More