CHAPTER ONE
1.0 INTRODUCTION
1.1 GENERAL BACKGROUND TO THE SUBJECT MATTER
Social amenities such as power generation, pipe borne water, telephone services and other utility installations are services which make life pleasant for the citizenry. The absence in the country is a serious matter in the social life of modern men. This accounts for the product management of establishment that handles these services in countries where of the citizenry is a priority.
Here in Nigeria, it is difficult to fathom what position these services occupy in its scale of preference going by the epileptic manner in which they are rendered.
Vandalization and outright theft of public property here become the role rather than exception. The sad fact is that NEPA whose services are so crucial to the nation, is the most susceptible attacks from saboteurs. Its network of cables and other materials for electricity generation and distribution are basically over ground and are spread throughout the country making it not protected in most cases. As a result daring thieves strict anytime to sabotage electricity cables, circuits breakers, nuts, bolts, angle irons of transmission towers.
The national electric power, authority (NEPA) which is an establishment that handles the services of power generation, transmission, distribution and sales be briefly said its origin. Electricity power generation development in Nigeria started towards the closing year of the last century when the first generating plant was installed in the city of Lagos in 1898. From this date onwards and until 1950, the pattern of electricity development was in the form of individual electricity undertaking set-up at various towns, some of them by the federal government under the jurisdiction of the public works department and some by the native authority and one or two large municipal authorities.
In 1950, in order to integrate power development and make it effectives, the government passed the electricity corporation of Nigeria ordinance No 15 of 1950. This ordinance brought under one control the electricity undertaking section of the public works department and all these undertakings which were under native authority or municipal ownership and control.
The electricity corporation of Nigeria usually referred to as “ECN” then become the statutory body responsible for generation transmission, distribution and sales of electricity to all consumers in Nigeria.
The Niger Denis Authority was established by an Act of parliament in 1962. The authority was responsible for the construction and maintenance of dams and other on the River Nile and elsewhere, generating electricity by means of water power construction of the Kainji Dam which began March 1964 was on schedule in December 1968.
In September, 1969 the federal military government decided to merge the electricity corporation of Nigeria, and Niger Dams Authority into a simple body. A year later, a Canadian firm of consultants “Shavno limited” was appointed to look into the technical details of the merger. The report was submitted in November 1971.
By decree N0 24 of 29th June, 1972 (Which become effective on 1st April 1972) the electricity corporation of Nigeria (ECN) and Nigeria Dams Authority (NDA) were merged to become the national electric power authority (NEPA). The actual merger did not take place until 6th January, 1973 when a general manager was appointed. The decree stimulated that the authority is to develop and maintain an efficient co-coordinated and economical system of electricity supply for all part of the federation.
The affairs of the authority is min by mines members board whose members and chairman are appointed by the federal military government through the federal ministry of mines and power. The board is to lay down the policy of the authority and the chief executive sees to it that all decision of the board are efficiently executed.
The day to day managing of affairs lies in the hands of the general manager. It presents his activities are grouped under six functional divisions such headed by an assistant general manager. The divisions are administration, engineering commercial, operation and finance.
The Enugu district of the authority which is the researcher case study is headed by a district manager.
Other sub-divisional heads include senior manager distribution, senior manager sales, senior manager accounts and senior manager administration.