If a load of mass 10N stretched a cord by 1.2cm, what is the total…

If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
  • A.
    6.0 x 10-2J
  • B.
    7.6 x 10-2J
  • C.
    1.8 x 10-2J
  • D.
    6.6 x 10-2J
Correct Answer: Option A
Explanation

Work done on a stretched cord
= Average force x extension
= (10 + 0)/2 x 1.2 x 10-2
= 6.0 x 10-2J

You May Also Like