DESIGN OF A MOBILE BIO DIESEL PRODUCTION PLANT

DESIGN OF A MOBILE BIO DIESEL PRODUCTION
PLANT

 

 

 

Department: Engineering – Chemical Engineering

 

 

Executive Summary

The main goal of this
project is to design a mobile biodiesel production plant, which is

capable of producing 3000
L of biodiesel per week. The design constraints specify that

the biodiesel production
plant must be sized to fit into a standard truck-trailer with

dimensions 8 feet wide by
40 feet long by 9.5 feet tall. The plant is to be self-sufficient in

one form of energy
(provided by the client), adaptable to different grades of waste

vegetable oil (WVO),
environmentally friendly, and economically feasible.

This report presents the
final design of the mobile plant in two-dimensional Process Flow

Diagrams (PFD’s) and
three-dimensional AutoCAD renderings. The main reaction, the

pre-treatment, and the
purification stages are described in detail and the proposed

process, including
equipment design specifications, is introduced. The feasibility of this

design was evaluated
through an environmental impact assessment and economic

analysis. Although the
contents of wastewater are unsuitable for discharge, the economic

analysis, including
wastewater disposal costs, proves the design to be economically

feasible. With the
production rate of 156,000 L biodiesel annually, a profit of $20563

each year is realized.

For the continuation of
this project, future groups are encouraged to collect data specific

to biodiesel and determine the demand for a such a mobile
plant.

1.0 Introduction

The purpose of this
project is to design an economically feasible mobile biodiesel plant

capable of processing
different grades of waste vegetable oil (WVO) to produce 3000 L

of biodiesel per week. The
mobile biodiesel production unit will travel to locations such

as cruise ship ports and
small communities, where the clients are participating in the

Biodiesel~In Motion program. The clients are
provided with two tanks, one for WVO

collection and storage and
the other for the biodiesel product. It is desired that the mobile

plant operate to meet the
production requirements of 3000 L of biodiesel per week at the

end of a 40-hour work
week, such that the plant requires two full-time operators. The

biodiesel produced can
then be sold back to the client to fuel their diesel-engined

machinery. In addition,
the only client requirements are that they must provide electrical

energy, water, and steam
for the mobile plant process.

This final report details
the plans and decisions that were made leading up to the

completion of the design
of the mobile plant. Section 2.0 will present the main reaction

that was chosen to convert
WVO to biodiesel, including the rationale and consequences

for this choice. The
process which takes WVO through pre-treatment, reaction, and

finally, purification is
described in Section 3.0 and illustrated in Process Flow Diagrams

and Piping and
Instrumentation Diagrams attached in Appendix B. The equipment that

this process requires is
sized and shown in Section 4.0. Section 5.0 discusses the

environmental impacts of
this mobile plant. Finally, based on equipment cost estimates,

the feasibility of this
mobile plant is evaluated in an economic analysis in Section 6.0.

Finally, recommendations have been proposed for the
continuation of this project.