ANALYSIS OF PRODUCTION SYSTEM DESIGN AND MANAGEMENT IN THE SOFT DRINK INDUSTRY

CHAPETR ONE

 

1.1            INTRODUCTION

Planning and forecasting are all elements of efficient.

The industrial and overall development  of any nation in one way or the other is based on the efficiency in the production sector of the nations economy this efficiency can only be achieved through the adequate and proper utilization of all the factors of production in conjunction  with designing a good production system.

In analyzing production system the following decision are involved

Decision about the quality of production facilities required and their respective location’s need to be made; there are also decisions about the required level of performance  and  the more decision have to be made on the desired method of production and the management procedure that is to be introduces.

When all the above have been adequately  taken care of the task of operating the production system is then considered in tackling this problem the management will have to formulate the production scheduling and control quality control and inventory management.  To undertake    these operations efficiently they will need to be properly defined in their design as in their relationship to the production system  other wise management will run into a brick wall it is only when all facts of the  production system are sequentially organized that the system can be efficiently operated         

 

1.2            HISTORICAL BACKGROUND 

This Limca Bottlers Plc was incorporated in Nigeria in 1985- it is owned by an incline national at inception they opened a plant at Warri which is still being regarded as their head quarters.

The Okigwu plant of Limca bottlers was commissioned in May 15th 1973.  at the Okigwu plant they produce a range of three brands of soft drinks namely: Limca Gold spot and Pearle soda their production machines which includes the horst corller Hansa serving increasing and justice citer where all imported from harmony. The plant is located along the Enugu to Okigwe express road  

 

1.3            STATEMENTS OF PROBLEM

The Nigeria nation is so complex and diversified that the we can not afford a poor production system design the attendant problems of  a poor production system design are numerous some of these are that it results to inefficiency in production which in turn leads to scarcity of goods and service which is a fall-out of constant break down in machines wastages in time and material delay in supplies and orders when  it is obvious all these are available coupled with very inferior method of production.

Poor organization may sometimes lead to a situation where the work standard in one sector being higher than in another sector with in the same production s

You May Also Like

STUDENTS PERCEPTION ON SKILL ACQUISITION SUBJECT: STUDY OF SOME SELECTED SECONDARY SCHOOLS IN KANO

As good as skill acquisition (Home economics) is, most students do not find the subject worthy of offering. Most students are of the opinion that only the female students need it most and thereby paying little or no intention to the subject at their early beginning. The study therefore sought to investigate the examines students’ perception on skill acquisition subject using four selected secondary schools in Kano, Kano State, Nigeria as case studies.The following are the research questions the study poised to answer: What are the perceptions of students towards home economics as a skill acquisition subject?What are the reasons for teaching and learning of home economics as a skill acquisition subject in secondary schools in Kano State?What are the efforts of the state government in ensuring effective teaching and learning of home economics as a skill acquisition subject in all secondary schools in Kano State?
Read More